pexels-kulbir-11079217
pexels-kulbir-11079217
pexels-kulbir-11079217
Tools and best practices to mitigate schedule risks
Home » Other  »  Tools and best practices to mitigate schedule risks
Tools and best practices to mitigate schedule risks
Attached is the Cynapse case study that is to be used for this paper. Below are the instructions for the paper. Also below are links to a few articles that should be used as a references. Instructions: Identification of Risks section: 2 pages -- Use of Methods from PMBOK Guide and assigned readings (5 points). A Risk Register is required! 1. Identification and careful phrasing of 5 project risks using methods from PMBOK Guide and readings assigned Identification and discussion of project scope, budget, intellectual property (IP), and resource risks facing Cynapse 2. Use of qualitative and quantitative risk rating with a scale of your choice: rating scales are placed at bottom of Register Risk Management Recommendation section: 2.5 pages Risk management processes, tools and project management approaches in managerial “recommendations’ format (5 points) 1. Tools and best practices to mitigate schedule risks 2. Methods to mitigate resource risks and loss of IP 3. Techniques and tools to limit “scope creep” 4. Methods for budgetary risks 5. Recommendations for managing documentation risks Article Links: https://www.jisc.ac.uk/full-guide/risk-management
Evaluating Risks Using Quantitative Risk Analysis
http://www.mpug.com/articles/pmp-prep-qualitative-vs-quantitative-risk-analysis/ Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide)–Sixth Edition (FRENCH): Vol. Sixth edition. Project Management Institute.

Leave a Reply

Your email address will not be published.

Scan the code